• Sample Page
film
No Result
View All Result
No Result
View All Result
film
No Result
View All Result

H0510001 Mag ina iginapos sa puno ng mismong ama ng sambahayan Directed by Nico Yecyec part2

admin79 by admin79
October 6, 2025
in Uncategorized
0
H0510001 Mag ina iginapos sa puno ng mismong ama ng sambahayan Directed by Nico Yecyec part2

Tunneling operations for the first contract package (CP) of the 33 km Metro Manila Subway kicked off on Monday after the deployment of the tunnel boring machine (TBM) at its train depot located in Ugong, Valenzuela City.

Related: Here are the terminals and route of the Metro Manila Subway

At the launch, Department of Transportation Secretary Jaime Bautista said that Metro Manila Subway project has passed the ‘point of no return’ for construction of the country’s first subway. Bautista also added that the subway is an urgent need for Filipinos in Metro Manila, following the recent holiday travel rush encountered by airports in Metro Manila.

“Today’s start of tunneling work signifies a point of no return. We are going full speed ahead to complete the country’s first subway,”

Jaime Bautista
DOTr Secretary

/ News

The Metro Manila Subway project has reached the ‘point of no return’—DOTr

Tunneling work for the 33 km subway has officially commenced

Jerome Tresvalles

Jerome Tresvalles on Jan 10, 2023You are here:HomeLatest StoriesNewsThe Metro Manila Subway project has reached the ‘point of no return’—DOTr

MMSP News Header

Tunneling operations for the first contract package (CP) of the 33 km Metro Manila Subway kicked off on Monday after the deployment of the tunnel boring machine (TBM) at its train depot located in Ugong, Valenzuela City.

Related: Here are the terminals and route of the Metro Manila Subway

At the launch, Department of Transportation Secretary Jaime Bautista said that Metro Manila Subway project has passed the ‘point of no return’ for construction of the country’s first subway. Bautista also added that the subway is an urgent need for Filipinos in Metro Manila, following the recent holiday travel rush encountered by airports in Metro Manila.

“Today’s start of tunneling work signifies a point of no return. We are going full speed ahead to complete the country’s first subway,”

Jaime Bautista
DOTr Secretary

Manila Subway TBM

The coverage of Contract Package 101 includes the construction of a train depot in Ugong, Valenzuela, and the following stations, Quezon Highway station, Tandang Sora station, and North Avenue station. The first phase of construction was awarded back in 2019 to the joint venture of Shimizu Corp., Fujita Corp., Takenaka Civil Engineering & Construction Co. Ltd., and EEI Corp.

According to Kazuya Osako, chair of the joint venture entity, six TBMs will be operating for this portion of the project, he also added that each tunnel would be completed in 12 months’ time.

The Department of Transportation says that the six TBMs will help excavate more than 1.2 million cubic meters of soil during the subway’s construction, equivalent to around 2,500 Olympic-size swimming pools.

Overall, the Metro Manila Subway is expected to be operational by 2028 and will run a total length of 33 km and include 17 stations, it has also been dubbed the “crown jewel” of the rail sector according to Bautista. The total budget for the subway project is P488.47 billion, once fully operational, it is expected to be able to service 519,000 passengers daily.

Upon its construction, the subway system will be running at an operational speed of 80 kph, Filipinos may soon be able to travel from Quezon City to NAIA in just 35 minutes rather than the current one hour and 10 minutes. 

Related Articles

EDSA rehabilitation postponed for a monthShould the EDSA Busway flow be reversed?DOTr, MMDA, and DILG assemble a task force to address “colorum” vehiclesDOTr: Motorists should expect traffic on some NCR roads due to tunnel boring machine transportDOTr commits to the extensive expansion of protected bike lanes in the next five years

Latest News

  • Changan Philippines introduces Nevo A05 plug-in hybrid / NewsShaynah Miranda · Oct 03, 2025Changan introduces the Nevo A05 plug-in hybrid sedan in the Philippines with 130 km EV range and 1,250 km total driving range.
  • Will the 677 hp Dongfeng M-HERO M817 Max+ make its way to the Philippines? / NewsShaynah Miranda · Oct 02, 2025Dongfeng has added a new model to its M-Hero lineup with the launch of the M817 Max+ in China.
  • NLEX Corp. rolls out P200 million SCTEX tech upgrades / NewsJerome Tresvalles · Oct 01, 2025NLEX Corp. has announced that it is investing P200 million in a major technology upgrade program for SCTEX.

View More Articles

Popular Articles

  • Cheapest cars under P700,000 in the PhilippinesJerome Tresvalles · Sep 02, 2024
  • First car or next car, the Ford EcoSport is a tough package to beatJun 18, 2021
  • Car Maintenance checklist and guide – here’s everything you need to knowEarl Lee · Jan 12, 2021
  • Most fuel efficient family cars in the PhilippinesBryan Aaron Rivera · Nov 27, 2020
  • 2021 Geely Okavango — Everything you need to knowJoey Deriquito · Nov 19, 2020
  • Family cars in the Philippines with the biggest trunksSep 20, 2023
  • Head to head: Toyota Rush vs. Suzuki XL7Joey Deriquito · Oct 28, 2020
  • Why oil changes are important for your carEarl Lee · Nov 10, 2020
  • 2021 Kia Stonic — What you need to know about itJoey Deriquito · Oct 16, 2020
  • Top 7 tips for buying a used car in the PhilippinesJoey Deriquito · Nov 26, 2020
Previous Post

H0510006 Madrasta gustong maging Reyna sa bahay na di kanya Directed by Nico Yecyec part2

Next Post

H0510010 Mataas maningil na Driver mga pasahero umalma Directed by Nico Yecyec part2

Next Post
H0510010 Mataas maningil na Driver mga pasahero umalma Directed by Nico Yecyec part2

H0510010 Mataas maningil na Driver mga pasahero umalma Directed by Nico Yecyec part2

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recent Posts

  • Kim Chiu, nagsampa ng qualified theft laban sa kanyang kapatid na si Lakambini Chiu
  • H2808008 Nagpasya ang ama na hatiin ang bahay upang subukan ang pagkatao ng kanyang mga anak at ang resulta part2
  • H0310001 Daddy ko noon, baby ko na ngayon #tbonproductionqc #tbonphilippines part2
  • Ang CEO na nagkunwaring mahirap ay labis na siniraan ng karamihan! part2
  • H0210001 babysiter kinawawa ng alaga #TBONMNL #tbonproduction #tbonphilippines

Recent Comments

No comments to show.

Archives

  • December 2025
  • October 2025
  • September 2025
  • August 2025

Categories

  • Uncategorized

© 2025 JNews - Premium WordPress news & magazine theme by Jegtheme.

No Result
View All Result

© 2025 JNews - Premium WordPress news & magazine theme by Jegtheme.